Agile Methodologies Linkedin Test Question Answer
Agile Methodology in Project Management
By dividing the project into phases and collaborating with stakeholders at each stage, the Agile methodology is used in project management. In the course of their work, teams go through three phases: planning, implementation, and evaluation. The Product Owner's role is to capture this vision and ensure that it is implemented by a multidisciplinary team. There are two different roles in Agile methodology
1. Scrum Master.
Scrum Master acts as team leader and facilities provider. They enable team members to follow practices so that customer commitments and requirements can be met.
2. Product Owner.
In a business context, the Product Owner is responsible for product management.
1. Which Agile methodology advocates the use of problem domain?
- Evaluate
- Scrum
- Extreme programming
- Feature-Driven Development
2. According to Agile manifesto what carries more value?
- Individuals and interactions over projects and tools.
- Individuals and interactions over products and tools.
- Individuals and interactions over processes and tools.
- None of the above
3. Which isn't a standard of the Scaled Agile Framework?
- Unify independent direction
- Apply frameworks thinking
- Take a monetary view
- Open the inherent inspiration of information laborers
4. Which proclamation concerning little, incessant arrivals of programming is valid?
- The opportunity for rollback is high
- It commonly requires a serious level of computerization
- In reverse similarity might be imperiled
- The regulatory expenses are high
5. Which ceremony should the Product Owner not attend?
- daily stand-ups
- Sprint Retrospectives
- story point estimating
- code reviews
6. Which strategy is preferred for development teams?
- Optimize for most work done.
- Maximize output and maximize outcome.
- Maximize outcome while minimizing output.
- Optimize for resource utilization.
7. Which statement about technical debt is true?
- Technical debt is another name for bugs
- It is at the Product Owner's description to allocate effort to reduce technical debt.
- Adding technical debt should be avoided at all costs.
- Technical debt is what the Product Owner owes to the developers if they work a lot of overtime to complete the sprint.
8. Which
procedure doesn't assist with focusing on the overabundance?
- MoSCow
- Kano
- WSJF
- Kaizen
9. To whom
should the Product Owner report?
- the Quality Manager
- the Product Manager
- the Scrum Master
- the Engineering Manager
10. Which
statement describes Shu Ha Ri?
- It is a library of coding patterns.
- It is a software testing strategy.
- It is a standard for interface design.
- It is a model for skill development and mastery.
12. What is a Scrum of Scrums?
- It is technique for two or more teams working together coordinate their efforts.
- It is another name for the Scrum Master Community of Practice.
- It is an information radiator used to compare the velocity of several teams.
- It is the system demo for teams on the same release train.
13. What is the name of the information radiator that has multiple columns used to visualize the flow of work?
- Work Flow Indicator
- Value Stream Map
- Story Map
- Kanban Board
14. Product development organizations sometimes use descriptions of archetypal users and their values so that developers can design the system to meet their needs and wants. What are these descriptions called?
- actors
- roles
- agents
- personas
15. What does the Agile Manifesto indicate?
Responding to change is more valuable than
following a plan.
- Documenting requirements up front is more valuable than at the end.
- Following the plan is essential for not going over budget.
- Contract negotiation should be used to settle disputes.
16. Why should a team do refactoring?
- It assigns developers to other teams in order to eliminate personality conflicts.
- It improves the functionality of the product,
- It recalibrates the success criteria for the product in the marketplace.
- It improves the design, which can lead improved development efficiency and maintainability.
17. What does the Definition of Ready mean?
- The story has been tested end is ready for release to production.
- The story is ready to be brought into a sprint.
- The stakeholders are ready to discuss their requirements for story.
- The team has completed sprint 0 and is ready to work.
18. What is the definition of capacity?
- It is an inventory of the team's knowledge and skills that is used to plan the work that they do.
- It is the number of teams that a Team Facilitator can support concurrently.
- It is an adjustment to velocity, used in Spring Planning, to account for reduced availability of team members during the upcoming sprint.
- It is the maximum number of stories that will be allowed in a sprint.
19. Which choice is a pillar of Lean?
- Frequent delivery of working software
- Respect for people and culture
- Courage
- Sustainable pace
20. The team is not going to complete its Spring Commitment. As the Team Facilitator, what should you do?
- Ask the PO to extend the sprint.
- Advise the PO as soon as possible.
- Report this at the Sprint Review.
- Point out the reasons why and collaborate on solutions.
21. What is an information radiator?
- a list of KPIs for the team
- a list of overdue action items
- the task board
- a highly visible display of key performance data
22. What is the main benefit of a working agreement?
- It specifies core working hours.
- It clarifies the reporting relationships on the team.
- It defines the culture that the team aspires to achieve.
- It compiles everyone's information.
23. What is the name of the ceremony in which you inspect the work completed during the sprint?
- Sprint Retrospective
- Sprint Review
- Next-Sprint Planning
- Velocity Confirmation
24. What is the Product Owner's role regarding the product backlog?
- The PO must identify the intended users of the features on the backlog.
- The PO is responsible for estimating the size of the total.
- The PO must identify the dependencies that impact the backlog.
- The PO decides what to include in the backlog and what to exclude.
25. What happens in Sprint 0?
- The team delivers no story points in that sprint.
- The team does regression testing prior to release to production.
- The team prepares to work on the product backlog.
- This is the time to inspect and adapt.
26. Which phrase best describes an Agile team?
- self-directed
- self-managed
- self-sustaining
- self-organizing
27. What is the forming-storming-norming, performing model of team development known as?
- the Tuckman model
- the Standard Team model
- Moore's Team Framework
- the Siebert model
28. Which choice best describes an Agile Release Train (ART)?
- continuous delivery
- comprised of the teams within a program
- DevOps Center of Excellence
- Scrum of Scrums
29. Which is the best definition of story points?
- They are a relative measure of the effort needed to complete a story.
- They a measure of development time only, test time is considered separately.
- They are a relative measure of the value of a story.
- They are a measure of time to complete a story.
30. Which choice is not a benefit generally associated with product demonstrations?
- Learn about new requirements.
- Learn feature suitability.
- Learn about feature usability.
- Learn about feature estimates.
31. Which element is most important when describing your product?
- its cost
- its licensing terms and conditions
- its benefits
- its features
32. What does collective ownership mean?
- Every member of the team can make changes to any part of the code as necessary.
- If someone is at fault, then the whole team is at fault.
- The team shares equally in the profits that the product generates.
- The team, not the individuals, receive performance evaluations.
33. What does a burn-down chart show?
- The declining energy level of the team
- The number of hours worked after dark
- The rate of reduction of budget for a project
- The progress of the work and features completed
34. What is the expected output of a Planning Poker meeting?
- The stories were discussed and each had a story point estimate assigned.
- The team gave feedback to the Product Owner about the acceptance criteria.
- The team decided what stories should be developed within the same sprint.
- The team made a preliminary plan for which stories will be completed in the next quarter.
35. Which statement about the Agile Manifesto is true?
- It was written via crowdsourcing and its authors are unknown.
- It has been translated into dozens of languages and used around the world.
- It was written in 2001 and is obsolete.
- It was first published as part of Jim Highsmith's doctoral thesis.
36. What are the responsibilities of the Scrum Master?
- Tracking and monitoring project development
- Work to obtain the project properly
- Improving the performance of the team
- All of the above
37. According to the Agile Manifesto, how often should developers and business people work together?
- as often as needed
- biweekly
- daily
- weekly
38. According to the Agile Manifesto, your highest priority is to _.
- minimize change requests
- satisfy the customer
- get the job done on time
- achieve the desired ROI
39. Which choice best describes the Team Facilitator?
- a gathering scheduler
- a record attendant
- a task administrator
- an Agile mentor
40. As an Agile coach, what should be your attitude toward your team members individual goals and motivations?
- Understand them—try align personal motivations with the team's progress toward the project goals.
- Nurture them-goals are the reason why people want to be at work.
- Disregard them—personal views have no bearing on reaching the project goals.
- Leverage them—use personal goals encourage team members raise their performance levels.
41. A team member comes to you with a complaint about another team member. What should you do?
- Bring the complaint to the other person and try to resolve the issue.
- Ask them to talk to the other person and try to work it.
- Notify HR of the problem and ask them to handle it.
- Invite both people a meeting and try mediate the conflict.
42. Which choice is not a Scrum value?
- focus
- integrity
- courage
- commitment
43. Which statement best describes Agile, Lean, and Six Sigma?
- They are strategies for delivering customer value.
- They were pioneered by Toyota.
- They are
strategies for discovering what the customer wants.
- They are derived from statistical process control.
44. What is a user story?
- A description of what an actor wants to do in order to accomplish a goal
- A description of archetypal users so the developers can make the solution user-friendly
- A report from the field about a user's experience with the product
- The Agile term for a requirement
45. The Product Owner is focused on testing a new system concept in the marketplace as quickly and inexpensively as possible. What is this first-generation product called?
- preproduction version
- focus group demonstrator
- Generation 1 product
- minimum viable product
46. What does the Definition of Done mean?
- The story meets the INVEST criteria.
- The team has completed all of the work in its Sprint.
- The story has been handed off to the DevOps team.
- The team has agreed on the criteria for story completion.
47. What is the name of the technique that divides a story into smaller pieces?
- mitosis
- story slicing
- disaggregation
- Divide and Conquer
48. What is the Scrum Master's role during the daily stand-up?
- Congratulate the team on their great work.
- Stand outside the circle of developers and listen for impediments.
- The Scrum Master should not attend—this meeting is for developers only.
- Ask each developer what they did since the last daily standup.
49. Which statement describes the flow of work in the Scaled Agile Framework?
- It is a "push" system.
- It is "push" at the top and "pull" at the bottom.
- It is a "pull" system.
- It is neither "push" nor "pull."
50. Why should you apply Weighted Shortest Job First?
- to maximize the return on investment
- to determine the economic sequencing of the backlog
- to visualize queue length
- to fulfill a commitment to quality
51. What is not a technique used for splitting user stories?
- split by line-of-business
- split compound user stories
- split by alternative paths
- split by interface
52. What should happen if the Product Owner does not accept a story by the end of the iteration?
- The team does not get credit for the story's points in its velocity calculation.
- The story should be sliced to reflect the work completed.
- The acceptance criteria should be adjusted to reflect the work completed.
- The story should be shown to stakeholders for their feedback.
53. Teams may encounter the need for "technical" user stories. Who decides the priority of these?
- the Product Owner with help from Operations
- the Tech Lead with help from the Product Owner
- the Product Owner with help from the Tech Lead
- the Tech Lead with help from Operations
54. The team complains that "things have been falling through the cracks lately." What should you do?
- Ask the team's manager to make role assignments so the team can catch up.
- Conduct a workshop to identify all of the things that need to be done and see who can help with each.
- Refer to the team's RACI (Responsible, Accountable, Consulted, Informed) assignments.
- Meet with the Tech Lead and Product Owner to try to identify what can be done.
55. A team member has been showing signs of great personal distress: crying at work, snapping at colleagues, having heated phone conversations. As Team Facilitator, what should you do?
- Give the team member space and time to deal with their personal issues.
- Tell the others on the team that their teammate needs some emotional support.
- Notify the team member's manager of your observations and ask the manager for help.
- Ask the team member if they would like to talk about what might be going on with them personally.
56. Which outcome is not expected of a Sprint Review?
- The team demonstrates its completed work.
- The team reflects on how to improve its performance.
- Items in the backlog may be reprioritized.
- Stakeholders give feedback about the work completed.
57. You have classified the features in your backlog according to risk and value. Which features should the development team work on first?
- low-value and high-risk
- high-value and high-risk
- high-value and low-risk
- low-value and low-risk
58. What is the Product Owner's role in deciding the priority of work in the sprint backlog?
- None—the Scrum Master should prioritize the work in the sprint backlog.
- The PO should prioritize the items in the sprint backlog.
- The developers prioritize work unless they cannot complete it, in which case the PO should prioritize the remaining work.
- None—the developers should prioritize the work in the sprint backlog.
59. What should happen if the Product Owner does not accept a story by the end of the iteration?
- The team does not get credit for the story's points in its velocity calculation.
- The story should be sliced to reflect the work completed.
- The acceptance criteria should be adjusted to reflect the work completed.
- The story should be shown to stakeholders for their feedback.
60. The team is not going to complete its Sprint Commitment. As the Team Facilitator, what should you do?
- Ask the PO to extend the sprint.
- Report this at the Sprint Review.
- Point out the reasons why and collaborate on solutions.
- Advise the PO as soon as possible.
61. Which statement is not true about the product backlog?
- It is a list of work items that are behind schedule.
- The items are maintained in priority order.
- Anyone on the team can propose an item for it.
- It includes all of the work to be done.
62. Which action is something the Team Facilitator should not do?
- Celebrate Success.
- Embrace servant leadership.
- Remove impediments
- Estimate story points.
63. When a user story is further decomposed, what are the elements called?
- technical tasks
- actors and actions
- Who, What, Why
- threads
64. What is a difference between a team's task board and a Kanban?
- A Kanban has an explicit rule to limit WIP.
- A Kanban shows the backlog of work.
- A Kanban does not use a Definition of Done.
- A Kanban shows the status of the work items.
65. A manager informs you that a developer from another team is between assignments, and she wants to place the developer on your team for a few sprints. What should you do?
- Explain to the manager that this will be disruptive to the team and ask that another assignment be found.
- Explain the situation to the team and ask them to go with the flow.
- Explain the situation to your manager and ask them to resolve it.
- When the temporary developer shows up, assign them to write documentation
66. On what are personas typically based?
- a sponsors or team members' personalities and traits
- what the developers think is user friendly
- real people, archetypal users, or composites of multiple users
67. BEST approach for estimation.
- Analogy
- Disaggregation
- Expert opinion
- All of the above
68. The team is complaining that they send request for clarification to the Product Owner, but these requests go unanswered. What action should you take?
- If there is a question about story, tell the developers to use their best judgement, avoid delay, and discuss the issue in sprint review.
- Send a note to the Product Owner saying the delays in completing the work will be their responsibility, not the team's.
- Develop a service-level agree (SLA) that defines certain response times for different types of request and ask the Product Owner to sign off on it.
- Schedule a problem-solving session with the Product Owner and the other team members.
69. Which factor should not be considered during Sprint Planning?
- the team's velocity
- the number of stories in the product backlog
- the stories that are ready
- the team's capacity
70. The Scaled Agile Framework advocates that, if you measure only one thing, what should you measure?
- quality
- predictability of delivery
- cost of delay
- return on investment
71. The team's manager wants to attend the Sprint Retrospective. What should you do?
- Agree to the manager's request and notify the team.
- Propose that the manager attend only every other retrospective.
- Propose a different forum for the manager to meet with the team.
- Ask the team if it is okay with them that the manager attend.
72. In the Scaled Agile Framework, what is the role of Enablers?
- They help extend the Architectural Runway.
- They connect vision to mission so the organization can be successful.
- They support team building.
- They remove the impediments to quality.
73. What is the name of the practice in which a cross-functional team collaborates intensively to develop a new product idea?
- Hackathon
- Scrum at Scale
- Innovation and Planning
- Magnum Focus
74. Who decides what the team will work on?
- the Scrum Master
- a self-organizing team
- the Product Owner
- the Product Manager
75. A project has some major risks that the team wants to mitigate. What is the best way to monitor how well this effort is going?
- risk-based spike
- risk-adjusted backlog
- risk velocity chart
- risk burndown graph
76. What do you call the practice of writing a test before the code is written?
- design for testability
- test-driven development
- unit testing
- test then code
77. Which action is something the Team Facillitator should NOT do?
- Embrace servant leadership.
- Estimate story points.
- Celebrate successes.
- Remove impediments
78. Which statement concerning small, frequent releases of software is true?
- The chance for rollback is high.
- It typically requires a high degree of automation.
- The administrative costs are high.
- Backward compatibility may be jeopardized.
79. Which statement about burndown and burnup charts is not true?
- Burndown charts show the work remaining to be done.
- Burnup charts show the work completed.
- Burndown charts are more useful than burnup charts.
- Agile project management tools can produce these automatically.
80. What is the name for the practice of going to see a process in use at the point of value delivery?
- Six Sigma
- Gemba walk
- Total Quality Management
- Kaizen
81. What is the definition of velocity?
- The number of story points delivered during a sprint
- The average waiting time for a story on the sprint backlog
- The average wait time for a story to move from the product backlog to the sprint backlog
- The time it takes a developer to complete a story divided by its relative value
82. Which is NOT a principle of the Scaled Agile Framework?
- Centralize decision-making
- Apply systems thinking
- Take an economic view
- Unlock the intrinsic motivation of knowledge workers
83. Which statement concerning small, frequent releases of software is true?
- The chance for rollback is high
- It typically requires a high degree of automation
- Backward compatibility may be jeopardized
- The administrative costs are high
84. Which choice is _not_ considered during Sprint Planning?
- stories that meet the Definition of Done
- team velocity
- stories that meet the Definition of Ready
- team capacity
85. You have noticed a pattern that the most interesting stories on the Sprint Backlog get started right away, and the least interesting stories languish or don't get done. What should you do?
- Use a lottery system assign each story.
- Share your observation with the team and invite them to own and solve the problem.
- During story point estimation increase the points assigned to the least interesting stories so the team can boost their velocity.
- Ask the Tech Lead to assign every story to a developer so they all get done efficiently and with accountability.
86. What is most important for a successful Product Owner to understand?
- The budget for the product.
- The underlying technology of the product.
- The development team's strengths and weaknesses.
- The business context for the product.
87. Which task is not the Product Owners responsibility?
- estimating story points
- refining acceptance criteria
- giving feedback to developers about the user stories
- demonstrating the work to stakeholders
88. What Agile practice best supports this principle: "At regular intervals, the team reflects on how to become more effective, then tunes and adjusts its behavior accordingly"?
- Sprint Review
- Sprint Retrospective
- daily stand-up
- Sprint Demo
89. In the Cynefin framework, where are "best practices" most appropriate?
- in the Complex regime
- in the Complicated regime
- in the Chaotic regime
- in the Obvious regime
90. Which of the following option is used to measure the size of a user story for an Agile project?
- Story points
- Function points
- Velocity points
- Work breakdown points
91. The VP of Engineering wants to start giving out a "Team Member of the Sprint" award to recognize a top performer in each group. What advice should you give this VP?
- This is unhelpful unless there has been recent employee feedback indicating that people feel underappreciated.
- This is a good idea as long as a different person is recognized in each sprint.
- This is a good idea because awards can motivate people to do their best.
- This is unhelpful because it can destroy the team unity essential to achieving high performance.
92. In Large-Scale Scrum, what is the recommended ratio of Scrum Masters to teams?
- One Scrum Master can support up to five teams.
- Large teams should have two Scrum Masters.
- There should be one Scrum Master per team.
- One Scrum Master can support one to three teams.
93. The Product Owner complains to you that the team is not working hard enough and they need to increase their velocity by at least 50%. Which action should you not take?
- Share the feedback from the PO and challenge the team to increase their velocity.
- Ask the PO to explain the business context to the team.
- Explain the impact of technical debt to the PO and the benefits of devoting some capacity to reducing it.
- Hold a Value Stream Mapping workshop to identify and reduce waste.
94. Who is responsible for a Scrum team's performance?
- the team
- the Scrum Master
- the Product Owner
- the Engineering Manager
95. What is the activity of clarifying and expanding user stories called?
- story point estimating
- Definition of Done
- user story expansion
- backlog refinement
96. Which of the following framework activities are found in the Extreme Programming?
- Analysis, Design, Coding, Testing
- Planning, Analysis, Design, Coding
- Planning, Design, Coding, Testing
- None of the above
97. Which statement is true about the actor in a user story?
- The actor does not have to be a specified role in the solution.
- There must be multiple personas for each actor.
- The actor can be the system itself.
- The system cannot be the actor.
98. When the team needs to make a decision, what is the best course of action?
- Try to achieve concensus.
- Take a vote and the majority rules.
- Identify the person who is most knowledgeable and ask them to decide.
- Let the most senior member of the team decide.
99. A team needs to do research, design, prototyping. What is this type of story called?
- Exploratory spike
- Backlog refinement
- Functional decomposition
- R&D
100. Which statement is true about Agile?
- Agile requires a high degree of up-front planning.
- Once the requirements are agreed to, the team can complete work.
- Agile requires a high degree of discipline.
- Agile works best when there is no contract.
101. Which statement about estimating is not true?
- Absolute estimating is more reliable than relative estimating.
- Relative estimating is more reliable than absolute estimating.
- In estimating, accuracy is more important than precision.
- In estimating, the effort is more important than the time required.
GIT (Global information Tracker) Assessment Test Answers
Linkedin MS Azure Test Question Answers
Linkedin Microsoft Excel Test Question Answers
MATLAB Assessment Questions and Answers
Microsoft Power BI Linkedin Skill Test Question Answers
Microsoft Projects Linkedin Test Question Answers